![]() ![]() Use form boards and leveling screed to establish the final height. In hot weather work in shaded areas or in the cool parts of the day, and use cold water to slow down the setting time.įor thicker applications use additional thin layers of QUIKRETE® Concrete Resurfacer or use a trowel applied layer after the initial squeegee application. In cool weather use warm water approximately 120F, (50C) to speed setting time. Adverse Temperature ConditionsĪt temperatures below 50☏ (10☌). Do not cover unless immediate rain protection is necessary. Protect from rain for at least 6 hours, longer in cool or damp weather. With cool temperatures allow longer curing time prior to use. ![]() Wait 6 hours before allowing foot traffic and 24 hours for automobile traffic. QUIKRETE® Concrete Resurfacer provides an economical alternative to removing and replacing existing old, spalled concrete. ![]() QUIKRETE® Concrete Resurfacer provides a beautiful, durable, wear resistant surface designed to withstand heavy foot and vehicle traffic. The best way to get an accurate estimate that matches the details of your specific project is to have a contractor such as SUNDEK of San Antonio come out to analyze your site.QUIKRETE® Concrete Resurfacer is a special blend of Portland cement, sand, polymer modifiers and other additives designed to provide a shrinkage compensated repair material for making thin repairs to sound concrete which is in need of surface renewal.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |